Tender notice for the bidding notice of PC general contracting project (Section 1 Suger Baby) of China National Nuclear Dalat Photovoltaic Leadership Award Base No. 1

作者:

分類:

requestId:6861491cbfea89.84425169.

1. Tendering Conditions

The PC general contracting project (Section 1) of the 100MWp No. 1 project of Guangnuo Dalat Photovoltaic Power Development Base (Trade 1) (Tendering Project No.: CGN-201910240002) has been approved. The funding source of the project is the company’s own and has been implemented. The bidder is China Guangnuo (Darat Banner) New Power Co., Ltd. This project has bidding conditions and public bidding is now underway.

2. Project overview, bidding scope and planning period

Project size:

This project is No. 1, Dalat Photovoltaic Power Generation and Power Base, with a machine capacity of 100MWp. The site is located on the north and west sides of the first phase of the Lat Runners Base, about 30km away from the northeast of Dalat Banner, and about 0.5km away from the S24 Xingba Expressway. The site is an unused land, with more sand dunes on the site, which is more large and convenient for the road. The coordinates of the center of the site are: N40.26°, E1Sugar baby09.67°Pinay escort, with an altitude of between 1100m and 1200m, and the total planned area is about 3.15km2.

Sugar daddy

No.1Sugar daddy Items are divided into A-4-1 (about 5 in the South Area) and A-1-1 (about 50MW in the North Area). A new 220kV lift station is located at the northeast corner of A-4-1 (the South Area). Install a main change platform with a capacity of 150MSugar babyVA, the main high-pressure side voltage level is 220kV, and the line transformer is connected. After completion, it is connected to the Wanli 220kV transformer station with a new 220kV line.

Tender content and scope:

This bidding project is divided into 2 tags: China National Nuclear Dalat LightSugar babyVolcano Power Racing Award Base 100MWp 1 Project is divided into A-4-1 block (about 50MW in the South Area) and A-1-1 block (about 50MW in the North Area), 220kSugar daddyV lift station is located at the northeast corner of A-4-1 (South Area). Installation of Sugar baby is equipped with a main change, with a capacity of 150MVA, and the main high-pressure side voltage level is 220kV, and the circuit transformer assembly is used for overview 2: line. This project is divided into two sections. The construction scope of the first section includes: A-4-1 block (South Area) Photovoltaic field area (04#-15# square area), a total of 12 square meters, with a capacity of about 40MW, including 220 kV lift station department; the construction scope of the second section includes: A-4-1 block (South Area) Photovoltaic field area (01#-03# square area), A-Sugar babyThe photovoltaic area (16#-31# square area) has a total of 19 square meters, with a capacity of about 60MW. This section belongs to a Song Weishi. When I saw the towel coming from the other party, I took it and said thank you. section of project project.

The content of this bid is:

The scope of the project is the first section of the project of the 100MWp 1 project of China National Nuclear Dalat Photovoltaic Power Development Base, all the construction installation and commissioning of all the 220kV pressure lift stations, including the installation and commissioning of all the constructions of the photovoltaic field and the 220kV pressure lift station. The important tasks include but are not limited to the following content: continuous processing of work, equipment and data procurement and supply, and equipment Sugar daddyRepair and data unloading and storage, photovoltaic area (including 35kV integrated circuits) and 220KV pressure lift station civil installation, construction, trial and inspection, full capacity of the entire station and stable network for 240 hours of trial operation (including network and experience receiving various certificatesManila escort Hand in hand and adjustment agreement, and undertake the various prices that occur in the process), defect removal, functional test, functional guarantee inspection of the entire system, technical and after-sales service, and all tasks that are completed (eco-friendly and water conservation, fire protection, Quality inspection, online security review, safe completion acceptance, common project development, professional health, power adjustment and energy quality testing, all functions testing, etc.), and also includes supply, entry and on-site delivery of spare parts (B-class equipment information), special items, consumables and related technical dataSugar daddyIn the construction and acceptance of work and experience, the construction and acceptance of hidden projects, the bidder shall be responsible for all tasks within the scope of the above tasks.

Detailed bidding technical documents for specific bidding scope.

Planning construction period:

The plan will start construction on November 10, 2019, and complete the jade department and power the Internet before May 31, 2020. (The total construction period is 203 days, and the specific start time is based on the supervision notice, and the full capacity and network time does not change).

3. Investor qualification request

1. Basic qualifications: The investor must be a company/company registered within the People’s Republic of China (excluding Hong Kong and Macao platforms) and has independent legal person qualifications. The investor (the leader) must have a safe production license and be within the useful period.

2. Qualification request:

For this bidding, the bidder must have the following qualifications:

General contracting for power engineering construction, and at the same time, the second and above qualifications for contracting and maintenance;

3. Financial request: publish a hundred articles in international core journals and serve as the final student of famous universities /

4. Similar engineering experience (professional results) request:

(1) Design results request: /

(2) Construction industry results request: /

5. Trust request: /

6. Personnel request

(1) Project manager: Have a Sugar baby registered first-class construction engineer registration certificate and the registered unit must have a different name from the bidder (record party), and have the “Certificate of Passing the Safety Production Inspection” within a useful period.

(2) Ping An employee: has a useful period of built-in “Ping An Production Inspection and Qualification Certificate”.

7. Other requests

(1) This project receives joint bids, and all parties to the joint must indicate the tasks they undertake in the joint agreement. All parties in the joint community need to supplyA complete set of review documents, and the business review is scored according to the standard of the registration document.

(2) The bidder (record) must be certified by ISO9000, ISO14000, ISO18000 series or plan a quality, environment, and safety system.

(3) A company/company can only participate in one joint bid, and if it participates in the establishment of a joint bid, it will not be too late to participate in the bid alone in the name of the bidder.

(4) The number of enterprises/companies that form a joint group cannot exceed 2; the two enterprises/companies that form a joint group must be registered as members of China Guangxi’s e-commerce platform, and the leader will register the joint member and register it in the joint name.

IV. Acquisition of bid documents

1. Acquisition time: the start time of obtaining bid documentsSugar daddy: 17:00 on October 24, 2019 (Beijing time); deadline: 17:00 on October 31, 2019 (Beijing time)

2. Acquisition method

(1) The bidder should be in the Escort during the sale period of the bid documents. manilaChina Guang Nuclear E-commerce Platform (https://ecp.cgnpc.com.cn) conducts online bidding registration. When registering, you must fill in the authorized bidding contact information.

(2) If the bidder has been registered as a member of the China Guangxi Nuclear E-commerce Platform, he or she can log in and register directly. Otherwise, she or she must first register as a member of the platform before she or she can register. For the steps to register a member, please refer to the China Guangxi Nuclear E-commerce Platform for details. If the “Business License” information changes when the bidder registers, please log in to the China National Nuclear E-commerce Platform to change the new information about the member registration information. If the bidder fails to change the new data registration information in time and affects the bidder’s bid, the bidder shall assume his or her own responsibility.

Sugar baby

(3) Each set of bidding documents is sold at 500 yuan. The bidder shall sell it in the bidding documents according to the above transfer account information.The price of the bidding documents for purchase during the period (book payment) will not be refunded after the sale.

Account name: China Guang Nuclear Engineering Co., Ltd.

Account ban TC:


留言